One
of the most reliable indicators of efficiency is customer
satisfaction. PE is proud to have 94% of our business from
repeat clients. It has always been our goal to put client
satisfaction first. Consequently, our client-list speaks
admirably of our achievements. The following provides a
synopsis of some of our work & clients: |
|
| |
|
|
|
| |
CITY, COUNTY & STATE |
|
| |
Brownfield Redevelopment |
|
| |
The
10th & Broadway project required a broad array of
environmental assessment and remediation services at a
multi-parcel Brownfield property spread over 20 acres.
|
| |
Previous usage of the individual parcels included a paint
and rubber cement factory, chemical company, gas station,
lumber yard, two auto salvage yards, an auto service
and towing facility, restaurant, school and
several residential facilities. Adjacent properties
included gasoline service stations, a metal salvage yard,
railroad tracks/spurs, tire recycling facility,
and residential lots.
PE functioned as
Prime contractor and performed the following: |
|
| |
|
|
|
| |
 |
Preliminary Assessments (Phase I ESAs) |
|
| |
 |
Wetland Investigation |
|
| |
 |
Magnetometer Surveys |
|
| |
 |
Phase
II Soil & Groundwater |
|
| |
 |
Underground Storage Tank Removals |
|
| |
 |
Remedial Action Work |
|
| |
 |
Preparation of Specs for Demolition / Disposal |
|
| |
 |
Field
Engineering |
|
| |
 |
Soil
Vapor Extraction Pilot Test |
|
|
 |
| |
FEDERAL HTRW REMEDIATION |
|
|
St. Louis Airport Site (FUSRAP) |
|

FUSRAP is a 28-acre
Hazardous, Toxic, and Radioactive Waste (HTRW) Site that was
purchased in the Mid 1940’s to store residuals from a
Mallinkrodt Chemical Works Facility chosen to refine Uranium
Ore into Uranium metal during the Manhattan Project Era.
During that Era, FUSRAP consisted of multiple dump sites for
pitchblende raffinate, barium cake, tailings of Uranium
scalping operations from magnesium flouride slag, oil, metal
scrap, and 52,500 barrels. In 1989, FUSRAP was placed on the
National Priority List by the USEPA, which requires clean-up
to proceed under the Comprehensive Environmental Response,
Compensation and Liability Act (CERCLA). PE performed the
following: |
|
 |
Remedial (Pre-Design) Investigation, Sampling Analysis |
|
 |
Data
Management Interpretation / Work Plan CADD Preparation |
|
 |
Field
Engineering / Removal Action Oversight |
|
 |
Summary Closure Report |
|
| |
|
|
COMMERCIAL / RESIDENTIAL |
|
|
Airport Expansion |
|
|
We
were contracted by the
Lambert - St. Louis International Airport to conduct
comprehensive environmental services in conjunction with
everyday airport operations as well as the Lambert – St.
Louis International Airport Expansion Program.
PE collected,
transported, disposed and recycled all household and
commercial hazardous waste located within the
structures to be demolished as part of the Airport Expansion
Program. PE developed a WASTE MANAGEMENT PLAN for over 1000
residential and commercial structures containing household
and commercial wastes. PE's PLAN included a hazard and
exposure assessment, health & safety practices and emergency
contingency plans for the safe handling, storage, packaging
and transportation to disposal / recycling facilities. |
|
|